RING TWISTER
Ring Doubling and Twisting Machines


Delivery Speed up to 120 meters / min.
Spindle Speed upto 8000 rpm.
Precise Ring Rail Control.
Pneumatic Pressurized Yarn Feeding.
Individual Spindle Motor System.
Tested Sections with Modular packing reduce setup times.
Panel For Setting and Displaying Spindle Speed, Twist Level, Crossing Angle, Stroke Length, Winding Type Yarn Speed Etc.
Outstanding Cost Performance ratio.
RING SIZE AND HEIGHT OPTIONS
Depending upon Denier and Yarn type there are various Ring Diameter options Available.
140 mm | 165mm | 200 mm| 250 mm | 300 mm


Ring Height Denier 9.5 MM 160-2500 16.7 MM 500-12500 25.4 MM 1000-26600 38.1 MM 1500-60000

Suitable Yarn: PES, PP, PE,HDPE, PA Fibrillated, Cotton, Wool, Acrylics,
Application: Fiberglass, Rayon, Packaging Yarns, Articial Grass, Ropes, Mops and Floor, Carpets, Protection, Cords, Braider Yarns
Denier Range: 600 - 120000 , 0.05Nm
Construction: 600/2, 1000/4, 2000/6
Speed: UPTO-8000 RPM
Voltage: 220/380/440 | 50-60 Hz
Drive System: Fully Inverter Controlled Drive For Spindle and Take Up
Model: R-140, R-160, R-200, R-250, R-300
Bobbin Shape: Bobbin, Bottle, Double Flanged Bobbin
Certification: ISO 9001 and CE MARK
FEATURES
Innovative high performance ring twisting machine for Single Step Plying / Doubling Twisting machine. Our twisting systems provide an optimum level of variability and flexibility for all type of Spun Yarn, Filament Yarn for Various normal and Technical Textile applications.




RUBBERISED PRESSURE ROLLER WITH HYDRAULIC PISTON
Rubberised Pressure Roller With Pneumatic Piston For Auto Lifting
It creates a smooth yarn path even for highly sensitive yarns like Glass, carbon and others.
In the event of yarn breakage, a sensing device sense the breakage results in Spindle stop and auto lifting of pressure roller.
PRECISE RAIL RING CONTROL
Monitoring by linear encoder
Weight compensation by counterweights Precise yarn storage and variable package building
Perfect unwinding from the twisted package for efficient Post processes.
EASY TO OPERATE BUTTONS / PANEL


Start button
Stop button
EMERGENCY STOP mushroom button
S/Z key switch for twist direction.
Touch Panel For Easy to Adjust Parameters Like amount of twist, Spindle, speed, crossing angle Length and timebased shut-down, Individual Length Counter (Optional) etc.
The production parameters entered can be stored in an article library and called up whenever required. Advance Reporting available like, Delivery speed, operating hours, Spindle Wise Breakage report, Production, Operator Eciency etc. The computer is equipped with a USB connection (Optional).
MOTORISED SPINDLE


Ring twisting spindle
Speed range 3000 rpm up to 8000 rpm
Spindle motors with system control and thermal protection
Electro Magnetic / Pneumatic spindle brake
Low maintenance.
WHY GLASS YARNS ARE TWISTED ON RING TWISTER?
Our Ring Twister has a broad range of functions for sensitive yarns like glass Fibers. Glass Twisted yarn with a perfect looking package is a prerequisite for further processing of the yarns when making fabrics. This is possible because of precisely controlled ring rail movement using a ball screw encoder system.






YARN BREAKAGE CONTROL
Event of yarn Breakage, Yarn Completion, are controlled by High Quality Sensors. These events are clearly indicated by a visible signal. In case of Breakage, Ply Missing,
Entanglement the ancillary functions, such as spindle stop and Pressure Roller auto lift are activated.
HARD CHROMED DELIVERY ROLLERS
With double hard chromed delivery rollers and pressurised pressure roller that reduces yarn slippage to zero. Pneumatical piston to lift the pressure roller in case of feeding yarn breakage Delivery speed up to 120 m/min.


ANTI-BALLOON RING
Antiballoon Ring / Limiter Ring is given for running of heavy denier yarns at higher speed.
There is a Provision of Overhead Creel Upto 3 Ply. For More than 3 Ply a Front Creel can be provided with advance creel features.
250 - 300 MM Package Width.
Rolling Spool for Unwinding of Twisted Yarns.
Washer Tension Device for each Ply.
Optical Sensor For Individual Ply.
NO OF PLY

RINGTWISTERAPLICATIONS


MULTI FILAMENT YARN
Polyester (PES)
Nylon (PA)
Polypropylene (PP)
Recylced Polyester (PET)
Polyethylene (PE)
High Density (HDPE)
UHMPE tape (UHMPE)
MONO FILAMENT / TAPE
Glass Fiber
Carbon
Aramid
Dyneema
Copper
Metallic Yarns
ADVANCE MATERIAL
Cotton
Viscose
Wool
Natural Fibers
Silk
Linen
Blended Yarn
Others
STAPLE FIBRES
Packaging Yarns, Raffia, Artificial Grass, Ropes, Packaging Braids, Mops and Floor Sweepers, Carpets, Protection, Sports, Conveyor Belt, Safety Belts, Geo Textiles, Cords, Braider Yarns, Twines, Cordages, Sewing Thread For Big Bags, Yarns for Narrow Fabrics, Technical Yarns, Cover Yarns, passementerie, fishing, Fence Wire, Slings, hoses.
ASK ANY QUESTION
Contact
info@codinabarcelona.com
+34 633 439 271 +34 932 538 310
HQ
Carrer Consell de Cent 59 D
08226 Terrassa, Barcelona
Spain